Project Timeline
- Assessment: Our initial inspection revealed that the existing tile roof was damaged beyond repair due to the storm.
- Removal and Recycling: We carefully removed the old tiles and ensured they were properly recycled, adhering to environmentally friendly practices.
- Roof Layout Preparation: Our team meticulously prepared detailed drawings for the new metal panels to ensure precise installation.
- Installation: The homeowner chose to upgrade to a high-end standing seam metal roof. We installed premium metal panels with concealed fasteners, enhancing both the aesthetic appeal and wind resistance of the roof.
Finished!